﻿<?xml version="1.0" encoding="UTF-8"?>
<!--RSS generated by Windows SharePoint Services V3 RSS Generator on 9/10/2010 2:16:55 PM-->
<?xml-stylesheet type="text/xsl" href="/Public/GWSD2008/GunnisonHigh/_layouts/RssXslt.aspx?List=638cbb2f-d7fe-4f59-8190-991337bb8c4f" version="1.0"?>
<rss version="2.0">
  <channel>
    <title>Gunnison High School: Posts</title>
    <link>http://www.blytheprojects.com/Public/GWSD2008/GunnisonHigh/Lists/Posts/AllPosts.aspx</link>
    <description>RSS feed for the Posts list.</description>
    <lastBuildDate>Fri, 10 Sep 2010 20:16:55 GMT</lastBuildDate>
    <generator>Windows SharePoint Services V3 RSS Generator</generator>
    <ttl>60</ttl>
    <image>
      <title>Gunnison High School: Posts</title>
      <url>/Public/GWSD2008/GunnisonHigh/_layouts/images/homepage.gif</url>
      <link>http://www.blytheprojects.com/Public/GWSD2008/GunnisonHigh/Lists/Posts/AllPosts.aspx</link>
    </image>
    <item>
      <title>Masonry Walls</title>
      <link>http://www.blytheprojects.com/Public/GWSD2008/GunnisonHigh/Lists/Posts/ViewPost.aspx?ID=8</link>
      <description><![CDATA[<div><b>Body:</b> <div class=ExternalClass2949E0446923426890CDBCA64CAAD548>
<div>
<p style="margin:0in 0in 0pt" class=MsoNormal><font size=3 face=Calibri>The 2009 renovation work is progressing nicely with the classrooms ready for paint.  This includes the three renovated classrooms, music and art rooms.  The south addition concrete masonry walls are complete and slabs are being finished this week.  The west addition walls are going up and the slabs are in place.  Reconstruction of the auditorium is underway with completion scheduled for early winter.  A new water line has been installed north of the building to accommodate the new fire sprinkler system being installed in the building.  The new locker rooms, weight room and training room under floor plumbing is underway so that slabs can be poured in the near future.</font></p>
<p style="margin:0in 0in 0pt" class=MsoNormal><a href="/Public/GWSD2008/GunnisonHigh/Lists/Photos/New%20masonry%20walls.JPG"><img id=webImgShrinked border=0 alt=Picture src="/Public/GWSD2008/GunnisonHigh/Lists/Photos/_w/New%20masonry%20walls_JPG.jpg" width=572 height=435></a></p></div></div></div>
<div><b>Category:</b> News</div>
<div><b>Published:</b> 7/23/2009 7:45 AM</div>
]]></description>
      <author>Faye Hall</author>
      <category>News</category>
      <pubDate>Wed, 29 Jul 2009 13:45:08 GMT</pubDate>
      <guid isPermaLink="true">http://www.blytheprojects.com/Public/GWSD2008/GunnisonHigh/Lists/Posts/ViewPost.aspx?ID=8</guid>
    </item>
  </channel>
</rss>